PLM, CAD, Warehouse & Production Systems
PLM System Implementation by SynapTech
PLM System Implementation

Go-Live Is the Milestone.
Adoption Is the Result.

A PLM system that technically works but that people route around has not been implemented, it has been installed. We deploy Windchill and 3DEXPERIENCE configured to your process, connected to your ERP, and used by the people it was bought for.

PTC & Dassault Systèmes Partner
Phased Go-Live, Not Big Bang
Integrations Built In-House
What the Project Covers Six Workstreams
Environment & Infrastructure
Servers, licences, security, and backup, on-premise or in the cloud
Configuration to Your Process
Data model, BOM structures, lifecycles, roles, and change workflows
Data Migration
Cleansing, mapping, and loading, including deciding what stays behind
Integration Development
Interfaces to your ERP, warehouse, and production systems
Testing & Validation
Acceptance testing run by your users, on your real data
Cut-Over & Hypercare
Phased go-live with our people on site while the system settles

Fixed scope and a committed schedule, agreed before the project starts. What comes after hypercare is covered separately by Managed Services.

What Determines the Outcome

Four Ways a PLM Rollout Goes Wrong,
and What We Do About Each

None of them are technical failures. The system usually works exactly as configured, which is the problem.

01
Failure Mode

Configured around the demo, not the process

The system gets set up the way it was shown in the sales presentation, because that is the version everyone has seen. Six months later, the workarounds start, and each one quietly carries process logic that now exists nowhere in the system.

What we do Configuration starts from your process design, and every deviation from standard functionality is documented with the reason it exists.
02
Failure Mode

Everything switched on at once

All departments, all data, all functionality, on one weekend. When something goes wrong, and something always does, nobody can tell which part caused it, and the organization loses confidence in the system in the first week.

What we do Phased go-live by department or product line, so each stage is stable before the next one starts and problems stay traceable.
03
Failure Mode

Twenty years of data migrated wholesale

Every file, every revision, every abandoned variant, moved across because deciding what to leave behind requires decisions nobody wants to own. The new system inherits the old mess and users stop trusting search results within a month.

What we do Migration scope agreed as a decision, not a default. Archive what has historical value, migrate what has operational value, and record which is which.
04
Failure Mode

Integrations deferred to a phase two that never comes

The budget covers the PLM system, and connecting it to the ERP is pushed to the next cycle. Meanwhile someone keeps re-typing BOMs by hand, and the single biggest benefit of the project never actually arrives.

What we do At least one working integration is in scope for the first phase. Our own engineers build it, so it is not dependent on a third party's schedule.

All four have the same root cause: decisions deferred because they are uncomfortable, then made by default under time pressure. Our delivery model forces each of them to be made deliberately, at the point in the project where changing your mind is still cheap.

Delivery Model

Five Phases, Each With
a Condition for Moving On

Projects rarely slip all at once. They slip because a phase closes while something is still open, and the gap surfaces two phases later. Every stage here has an exit criterion that has to be met before the next one begins.

Weeks 1 to 3 1

Mobilization & Solution Blueprint

We confirm the design before touching the system. If you have already been through a consulting engagement, this phase is short and mostly validation. If not, it is where the process decisions get made, because they will get made either way, and it is cheaper here.

In This Phase
  • Project team, roles, and decision rights established on both sides
  • Process design confirmed with the departments who will use it
  • Data model, BOM structure, lifecycles, and change workflow specified
  • Integration scope and interface behaviour defined
  • Migration scope decided, including what stays behind
Exit Criterion
  • Signed solution blueprint covering configuration, integration, and migration scope
  • A named business owner per process area, with authority to decide
  • Committed schedule and phase plan agreed by both sides
Weeks 3 to 8 2

Environment & Configuration

The system gets built to the blueprint. Infrastructure, licences, security, and the full configuration of the data model, roles, and workflows. Every deviation from standard functionality is logged with the reason, so the next administrator knows why it exists.

In This Phase
  • Environment set up, on-premise or cloud, with backup and restore in place
  • Licence server, user provisioning, and security hardening
  • Data model, object types, attributes, and lifecycle states configured
  • Roles, permissions, and change and release workflows built
  • Custom development where the standard configuration falls short
Exit Criterion
  • Configured system demonstrated against the blueprint, process by process
  • Restore from backup tested successfully, not assumed
  • Configuration documented, including every deviation and its reason
Weeks 6 to 12 3

Migration & Integration

Runs in parallel with configuration, because both depend on the same decisions. Data is cleansed, mapped, and loaded in trial runs before the real one, and at least one working integration is delivered in this phase rather than deferred to a later budget cycle.

In This Phase
  • Legacy data cleansed and mapped to the new structure
  • Trial migrations, with the results reviewed by your engineers
  • Interfaces built to your ERP, warehouse, or production systems
  • Error handling defined for what happens when a transfer fails
  • Interface testing with real data volumes, not samples
Exit Criterion
  • Trial migration accepted by your data owners, with discrepancies resolved
  • Integrations passing end-to-end tests in both directions
  • Rollback procedure documented and tested
Weeks 10 to 15 4

Validation & User Readiness

Acceptance testing is run by your people, on your data, against the processes they will actually perform. Not a demonstration by us. If your users cannot complete their own scenarios, the system is not ready, and that is a finding rather than a delay.

In This Phase
  • Test scenarios written from your real processes, not generic scripts
  • Acceptance testing performed by the users themselves
  • Key users and administrators brought up to working competence
  • Documentation and procedures handed over to your team
  • Findings resolved and retested before sign-off
Exit Criterion
  • User acceptance signed off by the business owners, not by IT alone
  • Administrators able to perform routine tasks without us in the room
  • Open findings either resolved or formally accepted for a later phase
Weeks 15 to 18 5

Cut-Over & Hypercare

Go-live happens in stages, by department or product line, so each one stabilizes before the next follows. Our people are present during the transition and for a defined hypercare period afterwards, with a documented route back if something does not hold.

In This Phase
  • Final data migration into the production environment
  • Phased go-live, with each stage confirmed before the next begins
  • On-site presence during cut-over and the first working days
  • Hypercare with fast-track escalation and daily status calls
  • Adoption monitored, so quiet workarounds surface early
Exit Criterion
  • System in productive use by the intended users, measured rather than assumed
  • Incident volume stable and within the agreed threshold
  • Handover pack complete: documentation, runbook, and open items list

What happens after hypercare

The project closes and the system moves into normal operation. Some companies take it over entirely with their own team, which is why the handover pack exists in the first place. Others keep us on for administration,

What We Implement

Two Platforms We Deploy,
and Everything We Connect Them To

As an authorized partner of PTC and Dassault Systèmes, we implement both platforms end to end. The integration layer is what turns either of them into something the rest of the business can use.

Windchill PLM

Product data and lifecycle management

What We Configure
  • Data model with object types, attributes, and numbering rules
  • BOM structures and the relationship between engineering and manufacturing views
  • Lifecycles and change workflows, including who approves what and when
  • Roles and access, mapped to how your teams are actually organized
Modules We Work With
PDMLink MPMLink ProjectLink Quality Solutions Supplier Management
Deployment
On-premise Private cloud Multi-site
More about Windchill PLM

3DEXPERIENCE Platform

Unified collaboration environment

What We Configure
  • Role and licensing structure, matched to who genuinely needs which capability
  • Collaborative spaces and the governance rules that apply inside them
  • Data model and lifecycles on the platform, with maturity states defined
  • Deployment model, whether cloud, on-premise, or a combination
Areas We Work With
ENOVIA Collaborative Business Innovator Platform governance
Deployment
Cloud On-premise Hybrid
More about the 3DEXPERIENCE Platform

The integration layer is where the project pays for itself

A PLM system that only serves the design office has delivered a fraction of what it cost. At least one working integration is in scope for the first phase, built by our own engineers rather than deferred to a later budget cycle.

Your ERP

BOM and revision transfer, item master synchronization, and change propagation into planning

InfoBiro

InfoBiro WMS

Item and packaging data flowing from engineering into warehouse operations

DigiPro System MES

Product and tooling data reaching the shop floor, with production feedback coming back

Other Business Systems

Document management, quality systems, and reporting, over REST, file exchange, or database level

What is feasible depends on how your ERP is configured, not only on which one it is. Two companies running the same product often need entirely different interfaces. Integration scope is defined during the blueprint phase, once we have seen both sides.

Three Starting Points

Where You Are Starting From
Changes the Whole Project

Implementation proposals often look identical regardless of the situation. They should not. These three starting points carry different risks, different effort, and different reasons for failing.

Greenfield

Your First PLM System

Product data lives on shared drives and in the heads of a few engineers. There is no system to replace, which sounds simpler than it is: every process rule has to be decided rather than inherited.

What Makes It Different
  • No existing configuration to work from, so the blueprint phase carries more weight
  • Data exists but has never been structured, numbered, or governed
  • Users have no reference point, so adoption depends heavily on how the change is introduced
  • Scope creep is the constant pressure, because everything looks possible
Main risk Trying to digitalize every process at once. We deliberately narrow the first phase to one product line or department.
Typical duration 4 to 6 months
Migration

Replacing an Existing System

You already run a PLM platform and are moving to another one. The migration is the project, and the hardest decisions are about what not to bring across.

What Makes It Different
  • Years of accumulated data, much of it obsolete, all of it someone's responsibility
  • Existing integrations that have to keep working during the transition
  • Users with habits formed on the old system, which is harder than having no habits at all
  • Both systems live in parallel for a period, which has to be planned rather than tolerated
Main risk Migrating everything by default. We treat migration scope as a decision with a named owner, taken in Phase 1.
Typical duration 5 to 8 months
Expansion

Extending What You Already Have

The system works, and now it has to cover a new site, a new module, or a connection that was left for later. The constraint is that the existing environment cannot stop while you extend it.

What Makes It Different
  • Production users are already dependent on the system, so every change carries risk
  • The existing configuration may not have been documented by whoever built it
  • A new site often works differently, and the question is whether to align it or accommodate it
  • Shorter and more predictable than the other two, provided the current state is understood first
Main risk Changing a live configuration nobody fully documented. We map the current state before touching anything.
Typical duration 2 to 4 months

What we need from your side

Worth stating before a contract rather than discovering during Phase 2. Implementation projects fail on client-side availability more often than on anything technical, and no amount of effort on our side compensates for it.

A Decision Maker

One person per process area with the authority to settle a disagreement, not to escalate it

Key User Time

Workshops in the blueprint phase and acceptance testing later, from the people who know the process

Access to Data Owners

Someone who can answer what a legacy attribute means and whether a folder still matters

IT and Security Clearance

Access approvals moving at the pace of the project, since this is where schedules slip quietly

We schedule around production and release cycles wherever possible, and the effort required from your side is estimated per phase in the project plan rather than left as an open commitment. If a period genuinely does not work, the schedule moves. What does not work is proceeding while assuming the availability will appear.

FAQ

PLM Implementation,
Answered Plainly

The questions that come up between the first meeting and the signed contract.

No. If you already have a process design, requirements, and a clear scope, whether from your own team or another partner, we start at Phase 1 and validate what exists rather than rebuild it.

What cannot be skipped is the decisions themselves. Data model, BOM structure, change workflow, and migration scope have to be settled before configuration begins. If they are already settled, Phase 1 is short. If they are not, that is what Phase 1 is for.

Where the decisions are genuinely open and the stakes are high, a separate consulting engagement is usually the cheaper route, because it happens before you have committed to a platform.

Yes. The new environment is built in parallel, so the system your teams use today keeps running until each department actually switches over.

The exception is the cut-over itself. For a defined window, usually a weekend, data is frozen while the final migration runs. That window is agreed in advance and scheduled around your release cycles, not announced two weeks before.

Because go-live is phased, only the department switching over is affected at any point. The rest continue as normal.

It gets sorted into three groups, and that sorting is a decision made in Phase 1 with a named owner on your side:

  • Migrated: data with operational value, cleansed and mapped into the new structure
  • Archived: historical records kept accessible but out of the working system
  • Left behind: obsolete revisions, abandoned variants, and duplicates

Nothing is deleted. Migration runs in trial rounds first, and your engineers review the results before the real one. The decision on what not to migrate is the one that determines whether the new system stays usable, which is why we insist on it being made explicitly rather than by default.

Enablement is part of the project, in Phase 4. We bring your key users and administrators to working competence on the configuration we built, using your own processes and your own data rather than generic exercises.

From there the knowledge spreads internally, which works better than an external trainer explaining your process back to you. The documentation and procedures we hand over are written so your key users can run onboarding for the rest of the organization.

The exit criterion for Phase 4 is specific about this: your administrators have to be able to perform routine tasks without us in the room before the phase closes.

Phase 1 is quoted as a fixed fee, because its scope is known: workshops, design confirmation, and a signed blueprint.

Phases 2 to 5 are quoted as a fixed price against that blueprint, once it exists. That sequence is deliberate. A fixed price given before the design is settled is either padded to cover the unknown or renegotiated later, and both outcomes damage the relationship.

Licences are separate and contracted directly between you and the vendor. We manage the commercial process but the agreement is in your name.

They will. On a project of this length, something in the business changes before it ends, and pretending otherwise is how projects end up delivering the wrong thing on time.

What matters is that changes are handled as decisions with a visible cost, rather than absorbed quietly until the schedule collapses. Each change request gets an assessment of effort, schedule impact, and what would have to move to accommodate it. You decide whether it goes in now, in a later phase, or not at all.

What we push back on is changing the design during configuration, because that is where a two-day change turns into a two-week one. If something fundamental shifts, it is usually cheaper to pause and revisit the blueprint than to build around it.

Yes, and it is a more common request than the industry likes to admit. It starts differently from a normal engagement: with an assessment of where the project actually stands, which is rarely where the status report says it does.

We look at what is configured, what is documented, what was tested, and what was quietly deferred. The output is an honest position and three options, usually:

  • Continue from here, with the gaps closed first
  • Rebuild specific parts where the configuration will not hold
  • Stop, if the premise itself was wrong

The third answer is uncomfortable and we give it when it applies. Continuing a project built on the wrong design costs more than restarting it.

Because we measure it rather than assume it. The exit criterion for the final phase is productive use by the intended users, and that means looking at what the system records: who is working in it, which processes run through it, and where activity is lower than expected.

A department with unusually low activity is not a training problem. It usually means a workaround has been found and nobody mentioned it, because the workaround is faster. Those surface during hypercare while the project team is still in place, which is the only time they are cheap to fix.

You receive a handover pack: full configuration documentation, an administrator runbook, integration specifications, and a list of anything formally deferred to a later phase.

From there, some companies run the system entirely with their own team, which is exactly what the handover pack exists for. Others keep us on for administration, upgrades, and integration maintenance under Managed Services.

That decision is planned for during Phase 5, while the project team is still in place, rather than raised in a hurry once everyone has moved on.

We work out which of the three starting points you are in, what is already decided, and what is still open. That usually takes one meeting.

The most useful thing you can bring is not a requirements document. It is an honest account of what has already been tried, including anything that did not work. Previous attempts tell us more about what will succeed here than any specification will.

From there we propose a scope for Phase 1 with a fixed fee, and you decide whether to proceed. Start there.

Question not covered here?

Describe your situation and we will answer against it, not against a generic project.

Ask an Expert
Start Here

A System Nobody Works Around
Is the Only One Worth Implementing

Tell us where you are starting from and what has already been tried, including anything that did not work. Phase 1 is quoted as a fixed fee and ends with a signed blueprint, which is the point at which a committed schedule actually means something.

1 Scoping conversation, no cost
2 Blueprint phase, fixed fee
3 Fixed price for the build
PTC & Dassault Systèmes Partner
Exit Criterion Per Phase
Handover Pack You Own