PLM, CAD, Warehouse & Production Systems
Products & Solutions

Four Systems, One Partner,
From the Design Office to the Shop Floor

Two of these manage what your product is. Two manage what actually happens when you make it and move it. Implemented separately or together, by a team that answers for all four.

Authorized Partner Of
InfoBiro
The Portfolio

Two Domains,
Four Systems That Work Together

Each of these solves a distinct problem and can be implemented on its own. Where two or more are in place, the connections between them are where most of the value sits.

Product Development Managing what the product is, from concept through every revision
Warehouse & Production Managing what actually happens when you make it and move it
Which One Do You Need

Start From the Problem,
Not From the Product Name

Nobody wakes up wanting a manufacturing execution system. They want to know where an order stands. Find the sentence that sounds like your company and follow it.

Nobody is entirely sure which revision is the current one.

Drawings live in several folders, someone keeps a personal copy, and production occasionally builds from a version that changed last month. The problem is not carelessness, it is that no system decides what is current.

Windchill PLM See how

Someone re-types every BOM into the ERP by hand.

Engineering releases a revision, planning enters it again manually, and every transcription is a chance for an error. The manual step has been quietly correcting for a structural mismatch all along.

Windchill PLM See how

Two sites work on the same product and their data has drifted apart.

Each location configured things its own way, reporting across the group requires manual reconciliation, and the same part can carry two different revisions depending on who you ask.

3DEXPERIENCE See how

Reviews with clients and suppliers happen over email attachments.

Feedback arrives as comments in a message thread, approvals are hard to trace, and nobody is certain the external partner is looking at the latest file. The approval cycle takes longer than the design work.

3DEXPERIENCE See how

A supplier recall means searching through delivery notes by hand.

The question is simple: which customers received goods from this batch. Answering it takes two people and most of a day, and the answer is never fully certain.

InfoBiro WMS See how

Expired stock gets discovered during a count, not before it.

Goods leave in whatever order is easiest to reach, so shorter dated pallets sit behind longer dated ones. The write-off arrives every quarter and everyone treats it as a cost of doing business.

InfoBiro WMS See how

Nobody can say where an order stands without walking the floor.

A customer asks when their delivery is ready, and answering it means a phone call to a shift supervisor who then goes and looks. By the time the answer comes back it is already slightly out of date.

DigiPro System MES See how

The same machines produce different output depending on the shift.

Everyone can feel the difference, nobody can put a number on it, and the conversation always ends in impressions rather than evidence. Without a measurement, there is nothing to improve against.

DigiPro System MES See how

More than one of these sounds familiar?

That is the normal case rather than the exception, and it is usually a sign that the symptoms share a cause. Which one to address first is a question worth answering before buying anything, and it is what a consulting assessment is for.

Talk It Through
How They Connect

The Value Is Rarely in One System.
It Is in the Space Between Them.

Each of these works on its own. What one partner across all four changes is the connections, because nobody has to negotiate whose responsibility an interface is.

PLM + ERP

The BOM stops being re-typed

The most common pairing, and usually the one that pays for itself first. Released revisions move into planning automatically, so production works from what engineering approved rather than from a copy made a month ago.

PLM + MES

The floor works from the current version

Product, tooling, and instruction data reaches the operator through the work order, and execution data comes back. Engineering finally sees how long a design actually takes to make, which changes the next design.

WMS + ERP

Stock figures match physical reality

Movements confirmed on the warehouse floor update the ERP as they happen, with lot and pallet identity carried through. The count at year end stops being a negotiation between two sets of numbers.

You do not need all four, and most companies start with one. The reason to note the connections early is that they are far cheaper to build when the first system is being configured than to retrofit two years later. What is feasible depends on how your ERP is set up, not only on which one it is, so integration scope gets defined during the assessment.

The Service Layer

Buying the Licence Is the Easy Part.
Everything Around It Is the Work.

Whichever system you choose, someone has to decide how it should work, build it, and keep it running. Three services, each with a defined boundary, so you know exactly what you are ordering.

You can enter at any of the three

The sequence above is how a project usually runs, not a package you have to buy end to end. Companies come to us with a finished specification and need only the build, or with a system that already works and needs someone to run it. Where you start is your decision, and each service is contracted separately.

Find Your Starting Point